Defficiency engineering overhaul
Created by: DamianX
Once upon a time, the AME exploded. And it took all the SMES units with it. Engineers were not happy. This PR does the following:
- Moves the three SMES away from the AME, just enough not to get shredded when it eventually blows up
- Removes the cabling and floor decals from the old SMES positions
- Moves the lockers and tables that were on the western wall to the opposite one, to make room for the SMES
- Wires the telecomms SMES to the grid (Who designed this?)
- Removes useless cabling from the telecomms room (Who the FUCK designed this?)
It's my first mapping PR so I probably botched this, but I'm feeling confident right now.
Before:
After:
- tweak: Moved the defficiency SMES units away from the AME.
- bugfix: Wired the defficiency telecomms SMES to the grid.
- rscdel: Removed some useless cabling around defficiency telecomms and engineering.