Skip to content

Small fixes to SSUs, APCs, air/fire alarms and SMES (#4034, #3257, #4036, #3354)

Rob Nelson requested to merge pull/4045/fixes into Bleeding-Edge

Created by: wwjnc

  • Fixed #4034 (closed); SSUs decontaminating suits is intended as per the description ([...] also allows the user to decontaminate the contents through a UV-ray purging cycle)
  • Fixed terminal bugs with SMES (#3257 (closed), #4036 (closed)) and added missing busy checks that resulted in duplicated stuff.
  • Fixed fire (and air) alarm bug #3354 (closed) and added sounds and message feedback to the construction steps.
  • APC and computer construction/deconstruction have busy checks now.
  • APCs now have to be wired from the correct direction, just like the SMES.

I plan to refactor wall mounted stuff (esp. air alarms) so they can be a bit more modular than the copypasted mess they are right now.

Merge request reports